|
Lead Structural Engineer (1983-84) Responsible for entire analysis, design, and site consultation for an 8-leg, 8-skirt pile offshore jacket and deck in 414 ft of water. Lightweight (3800 ton) jacket incorporated novel, single piece pile installation methods that resulted in a total platform installation time of only 8 days. Structure value was $8 MM.
|
|