Major Projects

Lead Structural Engineer  (1983-84)
Responsible for entire analysis, design, and site consultation for an 8-leg, 8-skirt pile offshore jacket and deck in 414 ft of water.  Lightweight (3800 ton) jacket incorporated novel, single piece pile installation methods that resulted in a total platform installation time of only 8 days.  Structure value was $8 MM.

Home Page | About Integritas | Services | Projects | Biography | Integrity Issues